Company Profile

    Company overview

    Company size

    11-50

    Primary location

    587 Viriyathavorn Building, 19th Floor, Dindaeng, Bangkok, Thailand
    The Xayaburi Dam is a hydroelectric dam under construction on the Lower Mekong River approximately 30 kilometres (19 mi) east of Xayaburi (Sainyabuli) town in NorthernLaos. The main purpose of the dam is to produce hydroelectric power. The project is surrounded in Preliminary construction began in early 2012.

    Jobs at Xayaburi Power

    Based on your search activity

    at Xayaburi Power Company Limited
    Bangkok Metropolitan Region
    Responsible for purchasing of an array of products linked to the overall engineering field
    Responsible for purchasing of an array of products linked to the overall engineering field
    classification: EngineeringEngineering
    27d ago
    27d ago

    at Xayaburi Power Company Limited
    Bangkok
    Operation of the Power plant following or exceeding applicable standards and regulations within the guidelines of the Power Purchase Agreement.
    Operation of the Power plant following or exceeding applicable standards and regulations within the guidelines of the Power Purchase Agreement.
    classification: EngineeringEngineering
    23d ago
    23d ago

    Reviews overview

    We don't have enough reviews for Xayaburi Power yet to show an average rating.

    Have your say

    Let others know what it's like to work at Xayaburi Power.Write a review
    Find out more about working at Xayaburi Power. Read company reviews from real employees, explore life and culture; and view all open jobs.
    This profile contains information from job postings, company websites, third-party databases and AI-generated content. Information may be incomplete or outdated. View our Company Profiles Terms.